RESERVED H100 SXM5

RESERVED H100 SXM5

RESERVED H100 SXM5

RESERVED H100 SXM5

NVIDIA H100 SXM5 80GB

The H100 SXM5 is the workhorse of the reserved compute market in Q1 2026. Reserving 1- to 36-month capacity locks rates below on-demand and guarantees scheduled availability critical for training runs that span weeks or months.

AVAILABLE TERM LENGTH

USED V100 32GB — Indicative Range (Q1 2026)

1MO

3MO

6MO

12MO

24MO

36MO

All term lengths available across the partner network. Longer commits unlock the deepest discounts and the strongest capacity guarantees.

TECHNICAL SPECIFICATIONS

VRAM

VRAM

80 GB HBM3

80 GB HBM3

MEMORY BANDWIDTH

MEMORY BANDWIDTH

3.35 TB/s

3.35 TB/s

FP 16 TENSOR

FP 16 TENSOR

1,979 TFLOPS (sparse)

1,979 TFLOPS (sparse)

FP 8 TENSOR

FP 8 TENSOR

3,958 TFLOPS (sparse)

3,958 TFLOPS (sparse)

TDP

TDP

700W

700W

FORM FACTOR

FORM FACTOR

SXM5

SXM5

INTERCONNECT

INTERCONNECT

NVLink 4.0 / NVSwitch (900 GB/s)

NVLink 4.0 / NVSwitch (900 GB/s)

ARCHITECTURE

ARCHITECTURE

Hopper

Hopper

Partner Network

AGGREGATED ACROSS LEADING NEOCLOUDS

Compute Exchange aggregates reserved capacity from a verified network of leading AI-native cloud providers and hyperscalers. All partners undergo identity, capacity, SLA, and operational verification before quotes surface on the network.

You receive a normalized comparison across providers in a single quote response rather than evaluating each neocloud's contract structure, billing model, and SLA terms in isolation. Compute Exchange stays neutral; we do not operate compute capacity ourselves.

WORKLOAD FIT

RESERVED H100 SXM5

USE CASES

01

Foundation model training

02

Multi-node distributed training

03

Production LLM inference

04

Long-running research clusters

WHY RESERVE

RESERVED H100 SXM5

VS ON-DEMAND

On-demand H100 SXM5 supply remains constrained at most providers, with 24-hour availability not guaranteed during peak demand. Reserved tenancy gives you a contractual guarantee on capacity windows plus material discounts, paid for through committed spend across the term.

FREQUENTLY ASKED QUESTIONS

RESERVED H100 SXM5

RESERVED H100 SXM5

KEY QUESTIONS

What term lengths are available for H100 SXM5?

When should I reserve H100 SXM5 versus running on-demand?

What workloads suit reserved H100 SXM5 capacity?

Can I reserve H100 SXM5 across multiple regions?

READY TO RESERVE?

GET A LIVE

GET A LIVE

RESERVED H100 SXM5

RESERVED H100 SXM5

QUOTE

QUOTE

Compute Exchange returns indicative pricing within 24 hours, anchored to your specific quantity, region, and condition. We do not publish active counterparty listings.

COMPUTE

EXCHANGE

The transparent GPU marketplace for AI infrastructure. Built for builders.

ALL SYSTEMS OPERATIONAL

© 2026 COMPUTE EXCHANGE

BUILT FOR THE AI ERA

COMPUTE

EXCHANGE

The transparent GPU marketplace for AI infrastructure. Built for builders.

ALL SYSTEMS OPERATIONAL

© 2026 COMPUTE EXCHANGE

BUILT FOR THE AI ERA

COMPUTE

EXCHANGE

The transparent GPU marketplace for AI infrastructure. Built for builders.

ALL SYSTEMS OPERATIONAL

© 2026 COMPUTE EXCHANGE

BUILT FOR THE AI ERA