Compute Exchange
Reserved GPU Rental/RESERVED B300

RESERVED B300

NVIDIA B300 288GB (Blackwell Ultra)

The B300 is the Blackwell Ultra flagship — 288GB of HBM3e and a step-change in FP4 inference throughput over B200. Allocation flows to frontier labs first; reserved commitments are the realistic path to 2026–2027 capacity outside direct NVIDIA channels.

AVAILABLE TERM LENGTH
1MO3MO6MO12MO24MO36MO

Early-allocation part. Providers quote 6-month-and-longer commitments; phased delivery is common as racks land.

TECHNICAL SPECIFICATIONS
RESERVED
VRAM
288 GB HBM3e
MEMORY BANDWIDTH
8 TB/s
FP 16 TENSOR
4,500 TFLOPS (sparse)
FP 8 TENSOR
9,000 TFLOPS (sparse)
TDP
Up to 1,400W (configurable)
FORM FACTOR
SXM (HGX B300)
INTERCONNECT
NVLink 5.0 / NVSwitch (1,800 GB/s)
ARCHITECTURE
Blackwell Ultra
Partner Network

AGGREGATED ACROSS
LEADING NEOCLOUDS

Compute Exchange aggregates reserved capacity from a verified network of leading AI-native cloud providers and hyperscalers. All partners undergo identity, capacity, SLA, and operational verification before quotes surface on the network.

You receive a normalized comparison across providers in a single quote response — rather than evaluating each neocloud's contract structure, billing model, and SLA terms in isolation.

WORKLOAD FIT

RESERVED B300
USE CASES

Frontier-scale FP4 inference
Trillion-parameter model serving
Next-gen training clusters
Reasoning-model deployment
WHY RESERVE

RESERVED B300
VS ON-DEMAND

B300 allocation is spoken for well before racks ship, and on-demand availability will be effectively nonexistent through 2027. Reserved commitments made now are how capacity outside the hyperscalers actually gets secured.

Frequently Asked Questions

RESERVED B300
KEY QUESTIONS

How constrained is B300 supply for reservations?+
Severely, through at least 2027. Blackwell Ultra allocation flows to hyperscalers and frontier labs first, and partner-network supply arrives in phased deliveries. Reserved commitments of 6 months and longer are how providers prioritize the allocation they do receive — on-demand B300 is not a realistic planning assumption.
What terms can I reserve B300 capacity for?+
Six, 12, 24, and 36-month terms. Shorter commits are generally not quoted while the part is allocation-constrained. Phased delivery schedules — capacity landing in tranches as racks are commissioned — are common for larger commitments and can be structured into the quote.
How does B300 compare to B200 for reservation planning?+
B300 carries 288GB of HBM3e versus 192GB on B200 and a significant step up in FP4 inference throughput. For inference fleets, the memory headroom changes batch economics; for training, the uplift is more incremental. B200 reservations quote faster and provision sooner — the tradeoff is locking last-generation silicon on a multi-year term.
Ready to Reserve?

LIVE QUOTE FOR
RESERVED B300

Compute Exchange returns indicative pricing within 24 hours, anchored to your specific quantity, region, and condition. We do not publish active counterparty listings.

Request a Quote